- July 23, 2024
- Posted by: АРОУ
- Category: Publications
No Comments
Types of Labor:
- Work at heights of 5 meters or more above ground level, from overhead coverings or work platforms, and work performed using lifting and suspended cradles.
- Construction, assembly, and disassembly of buildings and structures.
Personnel + Training and Equipment:
- 3 technical supervisors – general supervision
- 1 technical supervisor – high-altitude work
- 1 technical supervisor – cranes
- 2 cradle operators
- 2 slingers
- 3 high-altitude workers
- Safety belts and their inspection
- Technological plans for dismantling
Work Stages and Costs:
- Preparation of the document package for training and training personnel: 5-7 working days
- Preparation of documents for a positive conclusion from the expert commission, obtaining the expert conclusion: 3-5 working days
- Preparation and submission of documents to the territorial body of the state industrial safety inspection for obtaining a permit for high-risk work:
- 1-2 working days for document submission
- 10 working days for obtaining the permit for high-risk work
Development of Labor Protection Documentation:
The responsibilities of the lawyers include the development of the following documents:
- Job description of the labor protection engineer;
- Regulations on the development of labor protection instructions;
- Instructions for providing first aid;
- Fire safety measures;
- Electrical safety instructions;
- Labor protection instructions for performing high-risk work.
- Regulatory documents: orders, instructions, regulations;
- Record-keeping documentation: journals (knowledge checks, primary, secondary, and others, as needed by the client).
Time frame: 2-4 days, depending on the volume.
Подписаться (Subscribe)

