PERMIT FOR LABOR PROTECTION

Types of Labor:

  1. Work at heights of 5 meters or more above ground level, from overhead coverings or work platforms, and work performed using lifting and suspended cradles.
  2. Construction, assembly, and disassembly of buildings and structures.

Personnel + Training and Equipment:

  • 3 technical supervisors – general supervision
  • 1 technical supervisor – high-altitude work
  • 1 technical supervisor – cranes
  • 2 cradle operators
  • 2 slingers
  • 3 high-altitude workers
  • Safety belts and their inspection
  • Technological plans for dismantling

Work Stages and Costs:

  • Preparation of the document package for training and training personnel: 5-7 working days
  • Preparation of documents for a positive conclusion from the expert commission, obtaining the expert conclusion: 3-5 working days
  • Preparation and submission of documents to the territorial body of the state industrial safety inspection for obtaining a permit for high-risk work:
    • 1-2 working days for document submission
    • 10 working days for obtaining the permit for high-risk work

Development of Labor Protection Documentation:

The responsibilities of the lawyers include the development of the following documents:

  • Job description of the labor protection engineer;
  • Regulations on the development of labor protection instructions;
  • Instructions for providing first aid;
  • Fire safety measures;
  • Electrical safety instructions;
  • Labor protection instructions for performing high-risk work.
  • Regulatory documents: orders, instructions, regulations;
  • Record-keeping documentation: journals (knowledge checks, primary, secondary, and others, as needed by the client).

Time frame: 2-4 days, depending on the volume.